Circumflegrea Line Extension

In accordance with Law 910/86, Costruire S.p.A. is currently committed to the executive planning and construction of the elevation of all tracks on the Circumflegrea railway line between Pisani and Quarto, which will include the construction of a double railway viaduct of about 1.3km along with the necessary railway stations.
The completion of this project also includes the design and installation of all building works and special equipment such as railway superstructure, rail electrification, and railway signaling required for safe circulation of SEPSA trains.
The work is being carried out without the interruption of the circulation of SEPSA trains.